About the Project
The installation of MDPE and steel pressurized pipelines with sizes ranging from 225mm up to 2.2m. Multiple isolations and shutdowns were required to connect new pipelines to existing, due to the sensitivity of the clean water network. M2 Civils ensured the connections were achieved on time without adverse effect on the network.
GET IN TOUCH TO DISCUSS YOUR NEXT PROJECT
Social