Project Date

March 2019 to present

Client

Severn Trent water

Location

Birmingham UK

Principal Contractor

North Midland Construction (NMCN)

Project Value

£1M

About the Project

 

 

The installation of MDPE and steel pressurized pipelines with sizes ranging from 225mm up to 2.2m. Multiple isolations and shutdowns were required to connect new pipelines to existing, due to the sensitivity of the clean water network. M2 Civils ensured the connections were achieved on time without adverse effect on the network.

 

 

 