About the Project
M2 Civils were appointed by the Principal Contractor to install 600m of ridgisewer pipes and a bespoke triple run of elliptical concrete pipes in challenging ground conditions to provide storage capacity within the sewer system to prevent localised flooding in the area, part of the scheme required the installation of 300m of ‘Beany’ drainage kerbs to capture the surface water problems and divert them to storage, M2 Civils carried this work out on time, within budget and to client specification.
M2 Civils were awarded North Midland Constructions yearly innovation award due to the input at the design stage of the scheme to provide the most cost efficient, practical solution to the client’s needs..
GET IN TOUCH TO DISCUSS YOUR NEXT PROJECT
Social